Head To Head
Log In
Register
The Modern Antiquarian Forum »
Stonehenge »
Stone Shifting
Log In to post a reply

158 messages
Topic View: Flat | Threaded
GordonP
474 posts

Re: Yay!
Aug 16, 2003, 18:37
It won't be easy, but being a chippy I could soon knock up a mould for a 10 ton concrete stone. We'll need some sponsership though, the mold and the ready mix would cost £500 min. Six levers another £150 and if we decided to erect the stone as well as move it we'll need to lift it 7ft into the air, that'll take a fair lorry load of timber. Then we'll need somewhere to perform, might be able to do it at the tramway museum where I work. I'll leave you all to think about it.
Regards Gordon
Topic Outline:

The Modern Antiquarian Forum Index